The entire low-carbon fuels value chain asks for a clear and effective regulatory framework to support the uptake of #LowCarbon fuels in the EU.

Read the industry's position paper: https://bit.ly/3KL2OOf, in view of the upcoming @EU_Commission Delegated Act 🇪🇺

Join Rogier Roobeek, from @DNV_Group, at our exclusive study launch event on the contribution of terminal operators to securing and greening energy for Europe. 👉 https://bit.ly/4bwYvBR

🗓️ Wednesday, 26 June 2024
🕙 10:00-14:30 CEST
📍 The Hotel, Brussels

Join Matthias Janssen, from @FrontierEcon, at our exclusive study launch event on the contribution of terminal operators to securing and greening energy for Europe. 👉 https://bit.ly/4bwYvBR

🗓️ Wednesday, 26 June 2024
🕙 10:00-14:30 CEST
📍 The Hotel, Brussels

Join Anne-Sophie Corbeau, from @ColumbiaUEnergy, at our exclusive study launch event on the contribution of terminal operators to securing and greening energy for Europe. 👉 https://bit.ly/4bwYvBR

📅 Wednesday, 26 June 2024
🕙 10:00-14:30 CEST
📍 Location: The Hotel, Brussels

Load More...
 

The AquaDuctus project

By GASCADE & Fluxys

AquaDuctus will be a GW-scale offshore hydrogen pipeline – the first of its kind in European waters. The project is thus pursuing the goal of connecting large amounts of renewable hydrogen obtained offshore with the mainland and injecting into the emerging onshore infrastructure. In this way, demand centres, e.g. industrial chemical sites, hydrogen storage facilities etc. in Germany and other European member states can be reached.In a first phase, AquaDuctus connects a 15 MW hydrogen production plant (AquaPrimus II) off the coast of Helgoland with the consumers on the island. These projects were selected by the German Federal Ministry of Economics for funding as part of the hydrogen IPCEI process.

The next step is to connect the SEN-1 wind farm site, located 150 km north-west of Helgoland with a generation capacity of up to 1 GW for the production of green hydrogen, to the German mainland and the further onshore hydrogen infrastructure. Furthermore, it is planned to design the pipeline in such a way that a connection can be established to more distant future hydrogen wind farm sites in the exclusive economic zone of the North Sea in order to transport up to 10 GW of hydrogen production capacity to the German mainland (German Offshore H2 Backbone).

In addition, the pipeline also enables connections to other offshore hydrogen infrastructures of bordering European North Sea countries (European Offshore H2 Backbone). The pipeline, when fully utilized, will replace five high-voltage direct current (HVDC) cables that would otherwise need to be built and is therefore by far the most cost- and time-effective option for transporting large amounts of energy over long distances and has the lowest environmental impact.